Supply & Installation Service of VRF Air Conditioning System Comprising of Fan Coil Unit (FCU) & Dedicated Outdoor Air System
2020 - 2022
AMPANG MRT
Ampang
Biggest Tunnel Ventilation In Malaysia
2022
FACTORY OF SHOWA DENKO CARBON MALAYSIA
Banting
SUPPLY & INSTALLATION SERVICE OF CHILLED WATER AIR CONDITIONING SYSTEM COMPRISING OF FAN COIL UNIT (FCU), DEDICATED OUTDOOR AIR SYSTEM (DOAS) AND CHILLED WATER PLANT FOR ADMIN AND CAFETERIA BUILDING
2015 - 2023
RESIDENTIAL OF PROJECT ANCUBIC
CUBIC BOTANICAL @ Bangsar South
PEMBANGUNAN 2 BLOK PANGSAPURI SUITES 39TINGKAT (1,161 UNIT)
Our Job : ACMV
2016-2019
NINE SEPUTEH
Jalan Old Klang Road, KL
The major selling point of this project is its address along Old Klang Road (OKR or Jalan Klang Lama) within the Federal Territory (Wilayah Persekutuan) of Kuala Lumpur. A prime address that is just 5km from the country’s capital.
Our Job : To install 5000 Units ACMV system c/wACSU, Ducting, Control Panel, Electrical System, Building Management System (BMS), Testing Commissioning.
2018 - 2019
SAPURA HQ KLCC @ LOT91
Kuala Lumpur KLCC LOT 91 W
Our Job : To supply and install pre-insulated chilled water pipework c/w mechanical coupling joint, fittings, hangers, supports, vibration isolators, isolation valves, balancing valves, motorized valves, flexible connections, strainers, check valves, by pass valve, dirty drain valve, pressure gauges, thermometers, differential pressure sensor, automatic and manual air vent, EMCS interfacing port and all necessary accessories, painting and labeling for chilled water piping system within heat exchange room.
IN/OUTDOOR: Chilled Water System AHU
2019
RTM BANGSA
RTM BANGSA, KL
In/outdoor: CKD AHU
Total Capacity : 100VAF TO 210VAF – 30
Our Job:Completed Installation CKD AHU Control Panel, Electrical wiring Supply Labour Only
2019
MCKIP @ KUANTAN
MCKIP Kuantan
In/outdoor: MIDEA 5.0HP CEILING Cassette Unit
Our Job: Installation ACSU Cassette unit c/w Refrigerant Copper Pipes Electrical Wiring, Drain Pipes, Interfacing wiring, Bracket, Trunking & Piping works. Repairing c/w 2 blocks Apartment single unit / Air Con.
2018
AMBASSADOR ROW @ HOTEL KL
Jalan Ampang, Kuala Lumpur
In/outdoor: Air-Cooled Split unit
Our Job: To install renovation of Air-Cooled Split Unit and Testing Commissioning.
2015 - 2018
LAKE FRONT RESIDENCE @ TOWER 2
MCT CYBERJAYA - TOWER 2
In/outdoor: Air-Cooled ACSU Split Unit
Our Job: To install 4,000 of Air-cooled ACSU Multi split unit and testing and commissioning
2015 - 2018
SKYPARK RESIDENCE @ HOTEL TOWER 4
Cyberjaya
In/outdoor: Chilled Water System Hotel Tower 4
Our Job: To Install Chilled Water System c/w Chiller, AHU, Fan coil, Chilled Water Piping, Ducting, Control Panel, Electrical System, Building Management System (BMS), Mechanical Ventilation, Testing And Commissioning.
2015 - 2017
LAKE FRONT VILLA BANGLO
MCT Cyberjaya
In/outdoor: Air-Cooled Split Unit
Our Job: To install Air-Cooled Split Unit & Testing and Commissioning.
2015
UTAR UNIVERSITI
Sungai Long
In/outdoor: Chilled Water System
Our Job: To Install Chilled Water System C/W Chiller, AHU, Fan coil, Chilled Water Piping, Control Panel, Electrical System, Building Management System (BMS) , Testing And Commissioning.
2015
MCT HQ @ ONE CITY, USJ
USJ, Selangor
In/outdoor: Chilled Water System
Our Job: Retrofitting Chiller Plant Room, Chilled Water Piping, Control Panel, Electrical System, Testing And Commissioning.
2018 - 2019
MCT CYBERSOUTH, DENGKIL@GREEN CASA
Cyber South Phase 2
In/outdoor: Air-Cooled Split unit
Our Job: To install of Air-Cooled Split Unit and Testing and Commissioning
2018 - 2019
MCT CYBERSOUTH DENGKIL@LINKED HOUSE
Cyber South Phase 2
In/outdoor: Air-Cooled Split unit
Our Job: To install of Air-Cooled Split Unit and Testing and Commissioning